Customization: | Available |
---|---|
Die Casting Machine Type: | Cold Chamber Die Casting Machine |
Die Casting Method: | Precision Die Casting |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material: | ADC-12; A380 |
Cavity Number: | 1 |
Process Technology: | High pressure die casting |
Product Dimensions: | Customized |
Casting General Tolerance: | Grade GB-CT4 |
Surface Finish: | Polishing, Vibratory Deburring,Anodizing, Powder Coating, Painting,etc. |
Flow Processes: | Die casting, Trimming, Polishing, Vibratory Deburring, Machining, Cleaning,Painting,Packing, Shipping |
Control Measure: | Incoming Material Test, First Article Inspection, Routing Inspection, Final Item Inspection, and Outgoing Quality Control |
Inspection Equipment: | CMM, Caliper, Plug Gage,Thread Gage,Tensile Tester,Roughness Meter,Spectrograph,Air Gage,Air Leak Test,Projector,Pneumatic Measuring Tool,etc. |
Application: | Auto Parts, Industrial Machinery Parts; Farming Machine Parts |
Certificate: | IATF16949:2016 |
Lead Time | 30-35 days |
Trade Term: | FOB Ningbo |
FAQ |
Q1. When can I get the price? |
A: We usually quote within 2-3 days after we receive the RFQ or feedback within 2 days if any questions on prints need to be confirmed. |
Q2. How long is the lead-time for mold? |
A: Usually it depends on the size and complexity of the mold. But normally, the lead time is 35-45days. |
Q3. I have no 3D drawing, how should I start the new project? |
A: You can supply us a sample, we will help work on establishing 3D model accordingly. |
Q4. Before shipment, how to ensure the products quality? |
A: We have strict development procedure, during samples development, we have capacity to produce according to PPA, after PSW approved. |